Plumbing service · Canberra

Bathroom Renovation Plumbing Canberra

Precision plumbing for luxury bathroom renovations.

A luxury bathroom lives or dies on the plumbing behind the tiles. We deliver the full plumbing scope of Canberra bathroom renovations — set-out, rough-in, hydraulic drawings, waste and vent layouts, and premium fixture fit-off finished to designer standards.

We work directly with designers, tilers and cabinet makers to keep the trade sequence tight, waterproofing compliant, and the final finish flawless.

What we include

  • Set-out & rough-in

    Precise wall and floor set-out for tiles, cabinetry and freestanding tubs.

  • Waterproofing coordination

    We schedule around waterproofing and inspection windows so nothing gets torn up twice.

  • Premium fixture install

    Meir, Sussex, Astra Walker, Brodware, ABI Interiors — installed to torque and finish tolerances.

  • Freestanding bath installs

    Concealed traps, floor-mounted fillers and level verification for large stone tubs.

  • Concealed cisterns & wall-hung pans

    Geberit and Reece Ledin systems installed and finished plumb.

  • Heated floors coordination

    Coordination with electrical and screed trades for in-slab heating.

Our process

  1. Step 01

    Design review

    We review your bathroom plans with the designer to catch clashes before demolition.

  2. Step 02

    Rough-in

    All waste, vents and hot/cold set out to the millimetre for tiles and cabinetry.

  3. Step 03

    Waterproof & tile

    We hand over cleanly to the waterproofer and tiler with sign-off inspections.

  4. Step 04

    Fit-off & commissioning

    Fixtures installed, tempering valve set, flow rates checked, snag-free handover.

Frequently asked questions

Do you work with our designer or builder?+

Yes — we work directly with interior designers, architects and builders across Canberra. We'll review drawings and flag issues before demolition.

How long does the plumbing take on a bathroom renovation?+

Rough-in is typically 2–3 days; fit-off after tiling is another 1–2 days. Total on-site time depends on the tiler and cabinet schedule.

Can you install imported tapware and fittings?+

Yes — we regularly install imported European tapware. We verify WaterMark compliance before ordering to protect your warranty.

Do you handle waterproofing?+

Waterproofing is a separately licensed trade in the ACT — we coordinate closely with waterproofers we trust and schedule to their inspection windows.

Will the renovation affect the rest of the house's water?+

We isolate the bathroom during rough-in so the rest of your home has water. Fit-off day usually needs a brief mains shutdown, always at a scheduled time.

Related services

Need bathroom renovations in Canberra? Call SPS.

Licensed, insured, and built on excellence — call now or request a quote and we'll be in touch.